Central Urban Loop |
Whampoa Park Connector (along Bendemeer Road) will be closed for infrastructure improvement works by URA (20 Sep 2021 to 31 Mar 2023). |
For more information click here. |
|
Central Urban Loop |
Sections of Kallang Park Connector (along CTE, Serangoon Road, Bendemeer Road, Upper Boon Keng Road and Sims Avenue/Geylang Road) will be closed for infrastructure improvement works by URA from Q3 2021 to Q3 2023. |
For more information, click here. |
|
Eastern Coastal Loop |
Simei Park Connector between Upper Changi Rd and Upper Changi Road East (26 Apr 2017 to Jun 2024). |
For more information, click here. |
|
Northern Explorer Loop |
——– |
|
|
North Eastern Riverine Loop |
A section of Punggol Park Connector will be closed for HDB vehicular bridge construction from 31 March 2022 to 2nd quarter of 2023. Please use the alternative path indicated in the map to Punggol Waterway, Punggol PC and Sengkang Riverside Park |
For more information, click here. |
|
Southern Ridges Loop |
From 20 Feb 2023, the section of Ulu Pandan PC from Clementi Ave 6 flyover to Clementi Rd is open to the public. The remaining stretch of Ulu Pandan Park Connector near to the land slip area will continue to be closed for public safety. The North Bank will fully open in March 2023 while a 550 m stretch along the South Bank will remain closed till end 2023. Please do not enter the closed area. |
For more information, click here. |
|
|
Ulu Pandan Park Connector Updated on 3 Dec 2022 - We expect to reopen the Ulu Pandan Park Connector (North Bank) in the first quarter of 2023. A segment of the Ulu Pandan Park Connector (South Bank) near the incident area will remain closed until the final phase of recovery and reconstruction works is completed. |
|
|
|
Updated on 15 Sep 2022 - The eastern stretch of the Ulu Pandan Park Connector – on both banks of Sungei Ulu Pandan, from Commonwealth Ave West flyover to Clementi Road – will remain closed for public safety due to ongoing and planned recovery and repair works, as well as potential flood risk. |
|
|
|
Two segments of Ulu Pandan Park Connector – from Boon Lay Way and Ayer Rajah Expressway to Commonwealth Ave West flyover, and from Clementi Road to Commonwealth Ave West (near Ghim Moh Road) – are opened. Please note that there is no exit from Ulu Pandan Park Connector to Commonwealth Ave West near the incident area. |
|
|
|
The staircase from the park connector to Commonweath Ave West, next to HDB worksite (Clementi NorthArc), is closed to facilitate slope recovery works. Park users can enter/exit the Ulu Pandan Park Connector at Faber Heights Park. |
|
|
|
The eastern stretch of the Ulu Pandan Park Connector – on both banks of Sungei Ulu Pandan, from Commonwealth Ave West flyover to Clementi Road – will remain closed for public safety due to ongoing and planned recovery and repair works, as well as potential flood risk. |
|
|
|
Two segments of Ulu Pandan Park Connector – from Boon Lay Way and Ayer Rajah Expressway to Commonwealth Ave West flyover, and from Clementi Road to Commonwealth Ave West (near Ghim Moh Road) – are opened. |
|
|
|
Please note that there is no exit from Ulu Pandan Park Connector to Commonwealth Ave West near the incident area. |
|
|
|
The staircase from the park connector to Commonweath Ave West, next to HDB worksite (Clementi NorthArc), is closed to facilitate slope recovery works. Park users can enter/exit the Ulu Pandan Park Connector at Faber Heights Park. |
|
|
|
Agencies will continue to monitor the rain forecast and water level in the canal, and will temporarily close the park connector when necessary. |
|
|
|
Alexandra Canal Linear Park near Margaret Drive will be closed for road construction works by HDB from 25 January 2019 to Q4 2023. (Please use the alternate access route along Commonwealth Avenue and Commonwealth Towers to reach Dawson Road or Alexandra Queensway PC.) |
|
|
Western Adventure Loop |
A section of Choa Chu Kang Park Connector is closed for LTA’s upgrading works from 4 October 2021 to Q1 2025. For more information, refer to map |
Closure of CCK PCN |
|